Filter :
Standard and/or project under the direct responsibility of ISO/TC 195/SC 3 Secretariat | Stage | ICS |
---|---|---|
Building construction machinery and equipment — Pile driving and extracting equipment — Terminology and commercial specifications
|
90.92 | |
Building construction machinery and equipment — Pile driving and extracting equipment — Terminology and commercial specifications — Technical Corrigendum 1
|
60.60 | |
Drilling and foundation machinery — Soil or soil and rock mixture drilling and foundation machines — Commercial specifications
|
40.60 | |
Drilling and foundation equipment — Safety — Part 1: Common requirements
|
30.99 |
|
Drilling and foundation equipment — Safety — Part 2: Mobile drill rigs for civil and geotechnical engineering
|
30.99 |
|
Drilling and foundation equipment — Safety — Part 3: Foundation equipment
|
30.99 |
|
Drilling and foundation equipment — Safety — Part 4: Diaphragm walling equipment
|
30.99 |
|
Drilling and foundation equipment — Safety — Part 5: Jetting, grouting and injection equipment
|
30.99 |
|
Drilling and foundation equipment — Safety — Part 6: Interchangeable auxiliary equipment
|
30.99 |
|
Earth-moving machinery — Horizontal directional drills — Terminology and specifications
|
95.99 | |
Drilling and foundation machinery — Horizontal directional drilling (HDD) machines — Commercial specifications
|
60.60 | |
Drilling and foundation equipment — Horizontal directional drilling (HDD) machines — Safety requirements and verification
|
30.99 |
|
No matching records found. Please try changing the filter settings.