Standard and/or project under the direct responsibility of ISO/TC 192 Secretariat Stage ICS
Gas turbines — Acceptance tests
95.99
Gas turbines — Acceptance tests
95.99
Gas turbines — Acceptance tests — Amendment 1: for combined-cycle power plants
95.99
Gas turbines — Acceptance tests — Technical Corrigendum 1
95.99
Gas turbines — Acceptance tests
90.92
Gas turbines — Acceptance tests
20.00
Gas turbines — Procurement — Part 1: General introduction and definitions
90.60
Gas turbines — Procurement — Part 2: Standard reference conditions and ratings
95.99
Gas turbines — Procurement — Part 2: Standard reference conditions and ratings
60.60
Gas turbines — Procurement — Part 3: Design requirements
95.99
Gas turbines — Procurement — Part 3: Design requirements
90.60
Gas turbines — Procurement — Part 4: Fuels and environment
90.93
Gas turbines — Procurement — Part 5: Applications for petroleum and natural gas industries
95.99
Gas turbines — Procurement — Part 7: Technical information
95.99
Gas turbines — Procurement — Part 8: Inspection, testing, installation and commissioning
90.60
Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety
95.99
Gas turbines — Procurement — Part 9: Reliability, availability and maintainability
60.60
Gas turbines — Procurement
95.99
Gas turbines — Procurement
95.99
Gas turbines — Procurement — Amendment 1
95.99
Gas turbines and gas turbine sets — Measurement of emitted airborne noise — Engineering/survey method
95.99
Turbines and turbine sets — Measurement of emitted airborne noise — Engineering/survey method
90.93
Gas turbines — Exhaust gas emission — Part 1: Measurement and evaluation
90.60
Gas turbines — Exhaust gas emission — Part 2: Automated emission monitoring
90.60
Gas turbines — Vocabulary
90.93
Gas turbine combined cycle power plants — Thermal performance tests
90.93
Microturbines applications — Safety
90.93
Microturbines applications — Safety
20.98
Gas turbine applications — Requirements for power generation
90.93
Gas turbines — Data acquisition and trend monitoring system requirements for gas turbine installations
90.93
Gas turbine applications — Safety
95.99
Gas turbine applications — Safety
60.60
Gas turbine exhaust systems with or without waste heat recovery
60.60
Cogeneration systems — Technical declarations for planning, evaluation and procurement
90.93