Тезис
ПредпросмотрThis document specifies a method for the determination in a closed conduit of the volume rate of flow of a regular flow
a) of a fluid of substantially constant density or corresponding to a Mach number not exceeding 0,25,
b) with substantially uniform stagnation temperature across the measuring cross-section,
c) running full in the conduit, and
d) under steady flow conditions.
In particular, it deals with the technology and maintenance of Pitot static tubes, with the calculation of local velocities from measured differential pressures and with the computation of the flow rate by velocity integration.
-
Текущий статус: PublishedДата публикации: 2020-07
-
Версия: 3
-
- ICS :
- 17.120.10 Flow in closed conduits
Приобрести данный стандарт
Формат | Язык | |
---|---|---|
std 1 187 | PDF + ePub | |
std 2 187 | Бумажный |
- CHF187
Жизненный цикл
-
Ранее
WithdrawnISO 3966:2008
-
Сейчас
PublishedISO 3966:2020
Стандарт, который пересматривается каждые 5 лет
Этап: 90.92 (Будет пересмотрено)-
00
Предварительная стадия
-
10
Стадия, связанная с внесением предложения
-
20
Подготовительная стадия
-
30
Стадия, связанная с подготовкой проекта комитета
-
40
Стадия, связанная с рассмотрением проекта международного стандарта
-
50
Стадия, на которой осуществляется принятие стандарта
-
60
Стадия, на которой осуществляется публикация
-
90
Стадия пересмотра
-
95
Стадия, на которой осуществляется отмена стандарта
-
00
-
Будет заменено
Under developmentISO/AWI 3966
Появились вопросы?
Ознакомьтесь с FAQ
Часы работы:
Понедельник – пятница: 09:00-12:00, 14:00-17:00 (UTC+1)
Будьте в курсе актуальных новостей ИСО
Подписывайтесь на наши новости, обзоры, а также на информацию о продуктах.