Filter :
Standard and/or project under the direct responsibility of ISO/TC 192 Secretariat | Stage | ICS |
---|---|---|
Gas turbines — Acceptance tests
|
95.99 | |
Gas turbines — Acceptance tests
|
95.99 | |
Gas turbines — Acceptance tests — Amendment 1: for combined-cycle power plants
|
95.99 | |
Gas turbines — Acceptance tests — Technical Corrigendum 1
|
95.99 | |
Gas turbines — Acceptance tests
|
90.92 | |
Gas turbines — Acceptance tests
|
20.00 |
|
Gas turbines — Procurement — Part 1: General introduction and definitions
|
90.60 | |
Gas turbines — Procurement — Part 2: Standard reference conditions and ratings
|
95.99 | |
Gas turbines — Procurement — Part 2: Standard reference conditions and ratings
|
60.60 | |
Gas turbines — Procurement — Part 3: Design requirements
|
95.99 | |
Gas turbines — Procurement — Part 3: Design requirements
|
90.60 | |
Gas turbines — Procurement — Part 4: Fuels and environment
|
90.93 | |
Gas turbines — Procurement — Part 5: Applications for petroleum and natural gas industries
|
95.99 | |
Gas turbines — Procurement — Part 7: Technical information
|
95.99 | |
Gas turbines — Procurement — Part 8: Inspection, testing, installation and commissioning
|
90.60 | |
Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety
|
95.99 | |
Gas turbines — Procurement — Part 9: Reliability, availability and maintainability
|
60.60 | |
Gas turbines — Procurement
|
95.99 | |
Gas turbines — Procurement
|
95.99 | |
Gas turbines — Procurement — Amendment 1
|
95.99 | |
Gas turbines and gas turbine sets — Measurement of emitted airborne noise — Engineering/survey method
|
95.99 | |
Turbines and turbine sets — Measurement of emitted airborne noise — Engineering/survey method
|
90.93 | |
Gas turbines — Exhaust gas emission — Part 1: Measurement and evaluation
|
90.60 | |
Gas turbines — Exhaust gas emission — Part 2: Automated emission monitoring
|
90.60 | |
Gas turbines — Vocabulary
|
90.93 | |
Gas turbine combined cycle power plants — Thermal performance tests
|
90.92 | |
Gas turbine combined cycle power plants — Thermal performance tests
|
10.99 |
|
Microturbines applications — Safety
|
90.93 | |
Microturbines applications — Safety
|
20.98 |
|
Gas turbine applications — Requirements for power generation
|
90.93 | |
Gas turbines — Data acquisition and trend monitoring system requirements for gas turbine installations
|
90.93 | |
Gas turbine applications — Safety
|
95.99 | |
Gas turbine applications — Safety
|
60.60 | |
Gas turbine exhaust systems with or without waste heat recovery
|
60.60 | |
Cogeneration systems — Technical declarations for planning, evaluation and procurement
|
90.93 |
No matching records found. Please try changing the filter settings.